Instructions

Left click selects a triangle or path node - drag to move path nodes

Right click adds a vertex to the graph

Shift (or Control) + click toggles pathability of a triangle

The triangulated path uses a very naive heuristic and path length calculation at this stage, the red path (over a uniform grid will typically be more optimal)